Architectural Design Phases Guide
Quick answer: Architectural design phases run in a fixed order: schematic design, design development, construction documents, then bidding and construction administration. The owner approves at the end of the early phases, so decide carefully before each sign-off. Each phase ends with something the owner receives and, in the early phases, something the owner approves. This…
-

Architecture and Building Projects
Phase What it produces or decides Planning use Pre-design (programming) The foundation of the project, before any layout is drawn Settle what the building must do before paying for drawings; weak briefs cause rework later. Schematic design Basic floor plans, site plans and elevations Test layout and massing while changes are still cheap to draw.…