Tag: O&M manuals
-

As-Built Drawings and Project Handover
Handover situation Supported effect Planning use Field changes not marked on the plans Relocated walls or ductwork can conflict with the original design drawings and cause significant rework. Require changes to be marked on the drawings as work proceeds, not reconstructed afterwards. No accurate drawings when renovating Future renovation or maintenance needs extensive surveying and…