Tag: project handover
-

Architecture and Building Projects
Phase What it produces or decides Planning use Pre-design (programming) The foundation of the project, before any layout is drawn Settle what the building must do before paying for drawings; weak briefs cause rework later. Schematic design Basic floor plans, site plans and elevations Test layout and massing while changes are still cheap to draw.…
-

As-Built Drawings and Project Handover
Handover situation Supported effect Planning use Field changes not marked on the plans Relocated walls or ductwork can conflict with the original design drawings and cause significant rework. Require changes to be marked on the drawings as work proceeds, not reconstructed afterwards. No accurate drawings when renovating Future renovation or maintenance needs extensive surveying and…